Live Cameras
After 30 years pause Mitarbi resort was re-opened. Two ski-lifts and one surface lift were installed on the territory of Mitarbi, the construction of which was completed at the end of 2016 and was opened on December 25, 2016. Ski lifts of the world's one of the leading manufacturers – “Doppelmayr” were installed on the territory of Mitarbi. Totally there are three cableways: 1) 6-person chairlift, with movable traction system. Length - 1470 meters and capacity - 1800 passengers in an hour; location of the lower station - 1550 meters and location of the upper station -2005 meters above sea level. 2) 4-person chairlift with fixed traction system. Length - 955 meters and capacity - 1805 passengers in an hour; location of the lower station - 2000 meters and location of the upper station -2235 meters above sea level. 3) Surface lift. Length - 280 meters and capacity - 886 passengers in an hour; location of the lower station - 1950 meters and location of the upper station -2010 meters above sea level. Development regulation plan was implemented by the French Company “Geode”. The construction work for the foundation is carried out by the “Black Sea Group” Company.